Qube Electrical was tasked with replacing the existing indoor main switchboard with a new dual 2000A supply outdoor main switchboard at Croudace Bay 1 WWPS.
Project
Croudace Bay 1 Waste Water Pump Station (WWPS)
Services
Switchboard upgrade.
This upgrade was initiated to improve the safety, reliability, compliance and to facilitate a generator connection point in the event of an unforeseen power outage. A key safety aspect was the inclusion of of remote switching for the main circuit breakers, improving site safety and operational functionality.
Throughout the lifecycle, Qube Electrical ensured uninterrupted site functionality through strategic planning and coordination with the client. The project was completed seamlessly over two cutovers, carefully coordinated with the supply authority, resulting in zero downtime and a smooth transition to the new system.